ESC-2V
Before choosing operating conditions for surface activation before bonding, define the observable material result and the actual load.
Before bonding, validate contact angle and actual bond pull strength at a fixed treatment-to-bonding delay.
Identify contamination, substrate and the next bonding or coating step; assess cleaning and activation separately rather than judging success from treatment time alone.
Check power-source frequency, gas paths, electrode arrangement and sample shadowing. Recipes cannot be transferred between RF and other sources by matching power alone.
Screen with contact angle or surface energy, then validate with the actual adhesive using bond strength, peel or failure mode; record the treatment-to-bonding delay.
Check for surface damage, discolouration and heating from excessive treatment; compare samples at different loading positions for within-batch consistency.
Record the initial sample condition, loading layout, recipe version and raw measurements. Agree the acceptance endpoint before the trial; repeat at challenging load positions and compare the finished material result.
Candidate models in the current catalogue: ESC-2V, ESC-5V. These are comparison candidates, subject to the process checks above.
For this comparison, request the current specification for the selected configuration and the test conditions for your actual load.