2026-05-03
Moisture control process verification and risk control before adhesive layer curing
Moisture control process verification and risk control before adhesive layer curing:For precure moisture control, measure moisture and bubbles separately and confirm drying does not shorten working life. Assess results from cross-section bubbles, cured voids or bond performance, and record the delay between mixing and treatment.