2026-05-03
Lead frame cleaning and drying process verification and risk control
Lead frame cleaning and drying process verification and risk control:For lead frames, inspect residual moisture in hidden areas, surface particles and later bonding, fixing the post-cleaning delay. Confirm the sequence of evacuation, nitrogen admission and heating, and whether the circulation fan can operate in vacuum mode. Screen pressure-sensitive samples on a small load first.